|
*
Jury's Inn is one of the first hotels in the country to take advantage of voltage optimisation technology and, following the success of the Voltis system at its Birmingham hotel, more sites are being considered.
The project comprised two 800Amp Voltis units, one serving each incoming supply derived from the two high voltage transformers on site. Work started at 8am and was completed by 4pm, including testing and post installation checks.
Post installation a verification trial was carried out, measuring electrical consumption across a range of fan motors, most of which were also fitted with VSDs, the equipment for the trial having been specified by the hotel. Measurements under identical load conditions were taken with and without Voltis operating. The results demonstrated that a saving of 16.96% was being achieved by Voltis. Jury's Inn are very pleased with both the installation and reduction in electrical load that Voltis has delivered.
For further information contact:
Jeremy Dodge, Business Manager
Marshall Tufflex Energy Management
Churchfields Industrial Estate,
HASTINGS,
East Sussex
TN38 9PU
T: 01424 856610 F: 01424 856640 E: info@voltis.co.uk W: www.voltis.co.u
|